A GIANT has arrived at the Port of Grenaa
Under cover of the darkness the MANTSINEN 300 DEMG arrived on 4. April aboard the ship AURA
Watch the video of arrival here

The material handling machine is to date the Port of Grenaa's largest investment in machinery.
Along with the crane, four grabs and a hook were delivered - one of the grabs has a capacity of 25 m³.
The MANTSINEN 300 DEMG is equipped with a dual-power system (electric and diesel) and has a reach of 40 meters.
Over the past week, testing, training, and a review of the documentation have been conducted.






